Application Modernization

Legacy modernization that replaces systems without stopping the business

Legacy application modernization step by step instead of rebuilding. Strangler-fig migration, data migration and phased cutover, no interruption.

The Starting Point

How you know the legacy system is holding you back

Rarely through an outage. Usually because initiatives stop starting — nobody can estimate the impact any more.

Only two people understand the system

Both are close to retirement, and the knowledge is written down nowhere. Every change needs their time — and their goodwill.

Every change takes months

What is functionally a small change becomes a technical intervention with unclear side effects. The business units have stopped asking.

Support is running out

The operating system, database or framework no longer receives security updates. The audit report flags it, and the clock is running.

Nothing can connect to it

No customer portal, no mobile app, no analytics — the system has no usable interface, and every integration becomes its own project.

Running it costs more than renewing it

Licences, specialists and emergency callouts add up quietly. The cost of inaction appears in no project proposal — but it appears in the budget.

A full rewrite is too risky

The system runs the daily business. A green-field rebuild with a single cutover day is exactly the risk nobody wants to own.

What We Deliver

Four paths to modernization

Which path fits is decided by the analysis — not by sales. It is often a combination of two.

Legacy application modernization

Replacing grown applications without a cutover day. We first bring the legacy system under test coverage, then replace it module by module, running old and new in parallel until the last piece has moved.

  • COBOL, .NET Framework, Java EE, Delphi and VB6 estates
  • Characterization tests that pin down the legacy system's behaviour
  • Module-by-module replacement in parallel operation with result comparison
  • Data migration with validation and a documented rollback path
  • Knowledge capture: business logic is documented before it is replaced

COBOL · .NET · Java EE · Delphi · VB6 · Oracle · SQL Server

Monolith to Microservices

Decomposition only where it pays off. Following the strangler-fig pattern, new services grow around the monolith and take over traffic step by step — with no single day when everything is new at once.

  • Domain cuts along business boundaries, not technology layers
  • Strangler-fig pattern with a routing layer in front of the legacy system
  • Event-driven decoupling via Kafka or cloud queues
  • An honest assessment of which parts should stay monolithic
  • Gradual traffic shifting with measurement and a way back

Kafka · RabbitMQ · Kubernetes · API Gateway · OpenTelemetry

Architecture & Re-Engineering

For when the structure is the problem, not the technology. We surface the load-bearing architecture, price the technical debt by effort and risk, and design a target picture that can be reached in steps.

  • Architecture audit with a prioritized technical-debt register
  • Target architecture: cloud-native, event-driven, CQRS where it earns its place
  • API-first re-cut so portals and apps can dock on at all
  • Modernization roadmap with effort, risk and sequence
  • UI replacement (JSP, WebForms, jQuery) with React or Angular

React · Angular · REST · GraphQL · Domain-Driven Design · CQRS

Quality engineering & testing

The part without which modernization stays a gamble. Before we replace anything, we pin the existing behaviour down with tests — after that, every replacement is verifiable instead of assumed.

  • Test automation comparing legacy and new systems
  • Regression, load and integration tests in the delivery pipeline
  • Security testing and dependency scanning in every run
  • Test data management with anonymization under revDSG and GDPR
  • Quality metrics fit for a steering-committee report

Playwright · Cypress · JUnit · k6 · SonarQube · OWASP ZAP

Our Approach

Legacy application modernization, phased not big-bang

A big-bang rewrite demands that every business rule of the legacy system is known. With grown systems, it never is. So we replace module by module — the legacy system remains the reference until the new module meets it.

No cutover dayParallel operationRollback per stepTests before replacementKnowledge capture
01

Analysis & knowledge capture

We read the code, talk to the people who know the system, and write the business logic down. The result is a map with risk and effort per module.

02

Pin down with tests

Before anything is replaced, characterization tests capture today's behaviour. Those tests are what make every later replacement verifiable instead of assumed.

03

Module-by-Module Replacement

New modules take over traffic step by step while the legacy system keeps running. Every step individually approved, every step individually reversible.

04

Handover & Decommissioning

Only when the last piece has moved and been confirmed in parallel operation is the legacy system switched off — with documentation, runbook and an onboarded team.

Outcomes

What changes for you

The cost of inaction appears in no project proposal — but it appears in the budget. Four things that measurably change.

The business keeps running

No cutover day, no weekend of held breath. Parallel operation means: if a step doesn't hold, you go back one step — not twelve months.

More than two people again

Documented architecture and mainstream technologies mean you can hire from the market again — and no longer depend on two individuals.

Changes in days instead of months

Clear module boundaries and automated tests make changes calculable again. The business units start asking again.

Falling operating costs

Expiring licences, specialist premiums and emergency callouts drop away. The saving becomes visible because the legacy system's costs are captured first.

Analyze first, then decide

Not sure the modernization is worth it?

The analysis phase stands on its own: you receive risk, effort and sequence per module — and can then decide whether and with whom to continue.

Discuss an analysis
Proof

A modernization that ran exactly this way

Palisis of Switzerland — a frontend replacement, module by module, in parallel operation, with no forcing function for users.

Your Safeguards

What happens when a step doesn't hold

In modernization the fear isn't the budget — it's stopping the system that runs the company. That's why every step is reversible.

Business continuity first

There is no single day when everything is new at once. Old and new run in parallel, traffic shifts gradually, and every step has a way back.

Knowledge is captured, not replaced

Before business logic is rebuilt, we document it. You keep the documentation of your legacy system even if you stop after the analysis phase.

The modernized code is yours

Full IP transfer, repository on your side, no retained licences. The same terms apply to legacy estates as to greenfield builds.

An exit at every phase

Because replacement happens module by module, every phase is a complete state. You are never at a point where the only options are pushing on or tearing down.

Technology

From estate to target

The legacy technologies we migrate out of, and the target technologies we move into. The target side is deliberately mainstream — you should be able to hire for it later.

COBOL VB6 .NET Java EE Delphi React Angular Kafka Kubernetes PostgreSQL Oracle SQL Server Playwright SonarQube
FAQ

Common questions about legacy application modernization

The points that come up in every steering committee — answered up front.

Why not a full rewrite? Surely that's faster.

On paper yes, in practice rarely. A rewrite requires every business rule of the legacy system to be known — and with grown systems that is never the case. Module-by-module replacement surfaces the unknown rules while the legacy system still runs as the reference. If, after analysis, a rebuild really is the better choice, we say so.

Can the business keep running during the modernization?

Yes — that is the foundational condition of our approach. Old and new run in parallel, traffic shifts gradually, and every wave has a rollback plan. A cutover day when everything switches at once is explicitly not part of the model.

How long does a modernization take?

That depends on the scope of the business logic, not the line count. The analysis phase typically takes 4–6 weeks and ends with an effort estimate per module. Only then do we quote an overall duration — as a range. A number before analysis would be a guess, and a missed date does more damage than a cautious estimate.

What happens to our existing data?

Data migration is planned as its own workstream, with validation against the legacy system and a documented rollback path. Test data is anonymized under revDSG and GDPR before it reaches development environments — whether or not the project brief asks for it.

Our developers know the legacy system. How do you involve them?

As domain experts, not spectators. Your people know the rules that are written down nowhere — that is the most valuable contribution in the project. They typically join shared reviews and afterwards take over maintenance of the new system.

Explore Further

Related services

Request a modernization assessment

We'll review your system and deliver an assessment with risk, effort and sequence per module — even if our recommendation is to change nothing for now.

Book a Consultation